Pre-posession - this wall of cabinets will be moved to the wall on the right. |
|
|
The table/island on the left will be removed. |
|
|
|
July 18th, 2008 - Cabinets have been moved out, the wall has been removed, and I have started the repair work on the wood... |
|
|
The kids have been very eager to help out! |
|
|
|
|
|
|
|
|
|
Everything cleaned up - ready to start putting in the new oak planks. |
|
|
|
HVAC guy was out while we were in AZ to move the AC refrigerant line. When I returned I slapped together the header and put... |
|
|
New oak planks have been painstakingly spliced into the existing floor. This involved lots of time on my hands and knees... |
|
|
After the drum sander. Splices blend perfectly! You can see how lightening and refinishing the wood floors, along with... |
|
|
Polyeurathan has been applied. Kitchen is ready for some paint, and then to reinstall the cabinets. |
|
|
|
|
|
|
|
|
|
Kitchen cabinets are reinstalled on the south wall (they were originally on the east wall), electrical was rerouted, and... |
|
|
This is no longer my workspace, or so Stacey tells me. All my tools have been removed and the undesirable task of... |
|
|
Although there does not appear to be a big difference from the last photo - Stacey spent days cleaning and sanitizing the... |
|
|
February 20th - New Oven and Refrigerator. We can finally use and OVEN!!! Also replaced light fixture, new faucet. |
|
|
|