Lower Level Bathroom

Pre-posession - Salmon colored walls, cabinets, bathtub, toilet, etc. This bathroom is in desperate need of being gutted...

 

Pre-posession - There is a bad seal on the wax ring under the toilet - always a joy to replace!

 

Pre-posession.

 

March 2009 - Mold remediation and bracing to replace sill plates.

 

March 2009 - Bracing in place - rotton sill plate has been cut out, ready to put in new sill.

 

August 2009 - Sill is back in, mold remediation, and moisture control measures complete. Sheetrock back in, ready for...

 

 

 

 

August 2009 - The sink area is the main took shelf while finishing the basement.

 

August 2009 - Toilet in bathtub while sheetrocking and finishing the bathroom.

 

August 2009 - Painting the bathroom.

 

 

 

 