Pre-posession - More ideal color schemes! The cabinets will be removed and the entire room updated. |
|
|
Pre-posession. Carpet has been removed from this room and the cabinets will be going shortly. |
|
|
February 20th. There was no insullation in some sections of the office wall, so the more sheetrock needed to be removed... |
|
|
February 20th - Also, the west wall in this room also revealed disintegrated sill plates, requiring complete replacement. |
|
|
March, 2009 - Bracing and lateral support has been bolted to the west wall to for lifting to replace the disintegrated sill... |
|
|
March 2009 - Showing the lateral bracing - this is to prevent the outter wall from shifting in our out as the wall is jacked... |
|
|
|
|
|
|
|
|
|
June 2009 - This is the lateral bracing for the north wall. Instead of spanning across the room, the bracing has been... |
|
|
Detail showing the bracing and the replaced sill plate. Initial inspection of the North wall did not reveal sill damage,... |
|
|
August 2009 - Sills are done, the wall was insulated, and outside of the sill plates were packed with hydrolic cement and... |
|
|
August 2009 - Finshing the sheetrock. |
|
|
August 2009 - Patching the sheetrock in the ceiling. You can see the new access panel that was built under the master... |
|
|
October 20th 2009 - Dropped corner was busted up and repoured before floor leveling. |
|
|
|
|
|
|
|
|
|
October 25th 2009 - Floors have been ground before floor leveling - also walls are primed and ready for paint. |
|
|
Nov. 3rd, 2009 - Before laying the tile, 12 bags of leveling compound was poured and screed to be sure this floor was... |
|
|
Nov. 7th, 2009 - Tile is in and Stacey and I stayed up late last night grouting. After painstakingly laying the pattern,... |
|
|
Nov. 15th, 2009 - The last steps make the biggest difference. Walls are painted, baseboard is up. Outlets are wired, new... |
|
|
January 17th, 2010 - River has been moved in for a few weeks. Trim's been painted, lights installed. |
|
|
January 17th, 2010 - Closet doors need to be painted and re-installed. Wood floors have also been installed in the hallway... |
|