Pre-posession - Wirlpool tub. May replace this with a clawfoot depending on condition when cleaned up. |
|
|
|
Pre-posession -Glass surround is missing from the shower. Looks like the previous owners were working to update this room... |
|
|
|
July 22nd, 2008 - Sinks and vanity have been removed - area where wood floor needed patching has been removed, ready to put... |
|
|
|
New oak planks have been spliced into the floor. |
|
|
Sanded and poly has been applied. New planks blend perfectly. |
|
|
February 20th - Painted, and vanity sink top reinstalled. False wall put in to hide piping for sink. |
|
|
We plan on re-doing the master bath completely later, but wanted to patch it up to make it usable for the time being. |
|
|
Installed shower curtain bar until we are ready to put in full glass surround. |
|
|
Painted bath and replaced tile surround. |
|