Master Bathroom

Pre-posession - Wirlpool tub. May replace this with a clawfoot depending on condition when cleaned up.

 

Pre-posession.

 

Pre-posession -Glass surround is missing from the shower. Looks like the previous owners were working to update this room...

 

Pre-posession.

 

July 22nd, 2008 - Sinks and vanity have been removed - area where wood floor needed patching has been removed, ready to put...

 

 

New oak planks have been spliced into the floor.

 

Sanded and poly has been applied. New planks blend perfectly.

 

February 20th - Painted, and vanity sink top reinstalled. False wall put in to hide piping for sink.

 

We plan on re-doing the master bath completely later, but wanted to patch it up to make it usable for the time being.

 

Installed shower curtain bar until we are ready to put in full glass surround.

 

Painted bath and replaced tile surround.

 


edit

Powered by SPA