Pre-posession - Utility Closet, storage. |
|
|
July 20, 2008. Carpet has been removed from the stairs in preparation for sanding of the wood floors. |
|
|
Area under the carpet needed patching, ready to put in the new oak planks. |
|
|
|
Hallways have new poly applied. |
|
|
Removed entrance bench and replaced the light fixture, put in a table I built years ago and mirror. |
|
|
August 2009 - Downstairs hall - finishing the sheetrock. |
|
|
January 17th, 2010 - Wood floors have been installed in the basement after leveling and felt pad was put down. |
|
|
January 17th, 2010 - New maple floor in the basement hallway. |
|
|