Misc Areas

Album Date Not Set

Pre-posession - Entrance

 

Pre-posession - Entrance

 

Pre-posession - Utility Closet, storage.

 

July 20, 2008. Carpet has been removed from the stairs in preparation for sanding of the wood floors.

 

Area under the carpet needed patching, ready to put in the new oak planks.

 

Ready for new flooring.

 

 

Hallways have new poly applied.

 

Removed entrance bench and replaced the light fixture, put in a table I built years ago and mirror.

 

August 2009 - Downstairs hall - finishing the sheetrock.

 

January 17th, 2010 - Wood floors have been installed in the basement after leveling and felt pad was put down.

 

January 17th, 2010 - New maple floor in the basement hallway.

 

 