Pre-posession - Very usable space. Floor will be stripped and scraped, and we will put in tile, update the entire room with... |
|
|
Pre-posession. The perimiter of the room needs to have the walls opened up and repaird an treated for mold. I expect to... |
|
|
February 20th, 2009 - Finally getting o the basement (after 6 months) -flooring has been stripped and removed lower... |
|
|
February 20th - Lower 6 inches of wood is severly water and mold damaged, requiring removal and replacement. |
|
|
August 2009 - Finishing the sheetrock. Opening to the crawl space has been rebuild and covered. |
|
|
August 2009 - Ferring strips were replaced against the south wall prior to sheetrocking, and all exposed surfaces were... |
|
|
|
|
|
|
|
|
|
October 20th 2009 - Concrete over french drain was too high to grind down - so it was busted up and repoured before floor... |
|
|
October 25th, 2009 - Grinding the concrete clean and lowering high spots prior to pouring the leveling compound. |
|
|
Floors are ready for leveling. Walls have been primed. |
|
|
|
January 6, 2010 - Great progress in here recently too. Tiles done, grouted, sealed, walls painted, electrical done, trim... |
|
|
January 6, 2010 - Needing to be done yet is repaint old trim, and reinstall closet doors. |
|
|
|
|
|
|
|
|
|
January 17th, 2010 - Shelves have been installed in the closet. Lights have been hung. |
|
|
January 17th, 2010 - Lighting installed, furniture moved in. |
|
|
January 17th, 2010 - Furniture in place and the kids were using this room within minutes! |
|
|
|
|