Play Room

Pre-posession - Very usable space. Floor will be stripped and scraped, and we will put in tile, update the entire room with...

 

Pre-posession. The perimiter of the room needs to have the walls opened up and repaird an treated for mold. I expect to...

 

February 20th, 2009 - Finally getting o the basement (after 6 months) -flooring has been stripped and removed lower...

 

February 20th - Lower 6 inches of wood is severly water and mold damaged, requiring removal and replacement.

 

August 2009 - Finishing the sheetrock. Opening to the crawl space has been rebuild and covered.

 

August 2009 - Ferring strips were replaced against the south wall prior to sheetrocking, and all exposed surfaces were...

 

October 20th 2009 - Concrete over french drain was too high to grind down - so it was busted up and repoured before floor...

 

October 25th, 2009 - Grinding the concrete clean and lowering high spots prior to pouring the leveling compound.

 

Floors are ready for leveling. Walls have been primed.

 

 

January 6, 2010 - Great progress in here recently too. Tiles done, grouted, sealed, walls painted, electrical done, trim...

 

January 6, 2010 - Needing to be done yet is repaint old trim, and reinstall closet doors.

 

 

 

 

January 17th, 2010 - Shelves have been installed in the closet. Lights have been hung.

 

January 17th, 2010 - Lighting installed, furniture moved in.

 

January 17th, 2010 - Furniture in place and the kids were using this room within minutes!

 

 

 

 